Communication from the groups are still good, however I have not been able to find meeting minutes for two of the groups that I have been tracking so for one group I am not sure if they have met at all these two weeks and for the other group I am not sure if they have had a meeting for a week.
One of the groups had not done any of the tasks that had been set from the 01/03/17 to the 07/03/17 this either means that no work had been done for this sprint or that the group had forgotten to log the time that they had spent on the task.
The other groups have finished there tasks on time and they have been logging time.

Group Pitches Week 6.
I have been viewing the videos for week 6 of the project so
that I can see how the groups are progressing.
Group 11.
2 members present 1
member absent.
The group displayed the hours that they have currently spent
on the game. The team show that they are working well together and are doing
the correct hours that they have been set.
Group 12.
All members present.
The group have shown the work that they have produced during
the time leading up to the pitch, this is good as it shows that the team have been
producing the work that goes along with the tasks that have been set. The group
also show the hours that they have currently worked.
Group 13.
2 members present 1 member absent.
The group have shown assets that they have worked on during
the working time leading up to the pitch, this reaffirms the hours that they
have logged as they have the assets to show for it. The team did not have a
slide in which they had shown the hours that they had worked so far in this
project so the stakeholders do not know how long they have worked on the game.
Group 14.
All members present.
The team have shown a new concept that they have worked on
after having a change in the group, this is good as it shows that the team have
been able to deal with an issue and still manage to produce a new concept to
answer the brief. The team have been able to produce a prototype of the new
concept that they have been working on this shows that the team have been
working on the project consistently and that the time that they have been
logging for their tasks is shown by what they have produced. The team have
shown the hours that they have worked, and these reflect what is seen with the
prototype.
Group 19.
All members present.
The team show a number of assets that they have produced
during the time leading up to the pitch, this shows that the team have been
working well and consistently together to be able to produce a prototype with
the main mechanic being shown and working smoothly. The team have shown where
they would like to be by the end of the project. The team have shown the
current email count and the current hours that they have spent on the project.